Royal Moroccan Armed Forces


 
AccueilS'enregistrerConnexion
Maroc exploitation du Gaz/pétrole lourd53.772
Partagez | 
 

 Maroc exploitation du Gaz/pétrole lourd

Voir le sujet précédent Voir le sujet suivant Aller en bas 
Aller à la page : Précédent  1 ... 21 ... 38, 39, 40 ... 53 ... 67  Suivant
AuteurMessage
moroccan-soldier
Adjudant-chef
Adjudant-chef


messages: 429
Inscrit le: 25/02/2009
Localisation: Tetouan
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Mer 28 Déc - 13:32

Citation :
Morocco

San Leon has interests in the Tarfaya and Zag licence areas and two offshore licences - Foum Draa and Sidi Moussa. The company is also developing an in-situ oil shale (In-Situ Retort) technology in Tarfaya.

Tarfaya Oil Shale Project

Following completion of the first technical study at the end of 2008, optimisation and field analysis took place during 2009, with SLE's oil shale plant due to be operational by the end of 2010. Through careful ongoing procurement, the construction budget for the project will be less than half the estimated $4.6M.
Research indicates over 50 billion barrels recoverable (based on 62 litres per tonne) from this source and San Leon will implement an in-situ process for heat transfer to the shale pad at depth, and surface recovery of liberated kerogens and hydrocarbons.



Zag and Tarfaya Licences

The Zag and Tarfaya Basin licences, both 8-year licences, were signed in 2009 and 2008 respectively and the prospects are particularly encouraging, not least because Morocco offers excellent fiscal terms and SLE has established strong working relationships with the relevant authorities there.

The Zag Basin licence represents a 5.4 million acres (21,807km2) area which has seen large gas discoveries to the east and south of the licence, with other major players already active in the area. It is part of a larger basin which contains 43% of the known oil and 84% of the known gas reserves of the entire North African region (some 460Bboe recoverable). Planned export pipelines to the European markets have renewed interest in the previously unexplored Zag-Tindouf Basin.

Estimated resources in the licence area are 10+ TCF and 500+ MMBO.

In the Tarfaya Basin, SLE plans to add 500km2 of 2D seismic to the seismic it already has in its database. Discoveries in the Cap Juby offshore field and south of the SLE licence represent further encouragement while an NSAI report indicates up to 13.7 billion barrels OIP from 12 leads/prospects.

Foum Draa & Sidi Moussa

SLE's has two contiguous offshore licences - Foum Draa and Sidi Moussa - amounting to 13,000km2 sited in water depths between 100 and 2,000 metres.


3-D seismic had been shot over 3,800km2 in Foum Draa and a further 1,460km2 on Sidi Moussa, a total of 5260km2 3-D seismic valued at today's prices at $50m. These licences have exciting short-term potential with each estimated to yield half a billion barrels.


http://www.sanleonenergy.com/sanleon/operations/morroco_project.php?ln=en





Dernière édition par moroccan-soldier le Jeu 29 Déc - 14:02, édité 1 fois
Revenir en haut Aller en bas
moroccan-soldier
Adjudant-chef
Adjudant-chef


messages: 429
Inscrit le: 25/02/2009
Localisation: Tetouan
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Mer 28 Déc - 13:35

l'explorations par la compagnie pétrolière (Kosmos Energy) incluent les eaux du Sahara marocain Twisted Evil



http://www.kosmosenergy.com/morocco.html
Revenir en haut Aller en bas
IDRISSPARIS
Caporal
Caporal


messages: 146
Inscrit le: 27/08/2010
Localisation: PARIS
Nationalité: Maroc-France

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Mer 28 Déc - 21:37

Bonsoir a tous

comment allez vous tous, je veux juste savoir avec tous ces chiffre que j'ai lu en haut est ce qu'il y a oui ou non du petrole et du gaze ? .

Ces frustrant de lire tous ces effet d'annonce . Si il y a il devrait faire vite pour l'exploitation vous avez vu l'etat des compte du ROYAUME DU MAROC . Shocked Shocked

On peut pas se permettre de laisser cette richesse sous terre .

Merci beaucoup :balkom:
Revenir en haut Aller en bas
PGM
Administrateur
Administrateur


messages: 6647
Inscrit le: 12/12/2008
Localisation: paris
Nationalité: Maroc
Médailles de mérite:



MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Mer 28 Déc - 22:20

Oui Idrissparis, il y a du petrole et du gaz. Mais les questions liées a son exploitation economique sont plus nombreuses que les réponses.
Y en a t-il en quantité suffisantes pour justifier de lourds investissement ? ça semble de plus en plus plausible (il faut multiplier les forages pour augurer du potentiel, mais tout ça coute cher).
Pour la rapidité, faut oublier, les hydrocarbures, c'est de longues années (entre 5 et 7) entre la certitude d'un potentiel et la vente du premier baril.
Cela dit, a 100 $ le baril, plein de gisements considérés autrefois comme secondaires vont apparaitre comme économiquement viables , le problème que que les cout de développement ne sont pas très différents entre grands et petits gisements.

Pgm
Revenir en haut Aller en bas
dinamic
sergent chef
sergent chef


messages: 262
Inscrit le: 25/11/2008
Localisation: maroc
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 8:37

trés important . je suis dezoler pour la traduction http://hespress.com/interviews/45030.html
Revenir en haut Aller en bas
yassine1985
Colonel-Major
Colonel-Major


messages: 2591
Inscrit le: 11/11/2010
Localisation: Marrakech
Nationalité: Maroc
Médailles de mérite:


MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 8:51

dinamic a écrit:
trés important . je suis dezoler pour la traduction http://hespress.com/interviews/45030.html

à prendre avec des pincettes il y a surement du vrai dans ce qu'il dit (surtout avec l'histoire des % qu'on connait tous ...) mais je ne sais pas s'il est vraiment crédible dans ce qu'il avance.

_________________
."قال الرسول صلى الله عليه وسلم : "أيما امرأة استعطرت فمرّت بقوم ليجدوا ريحها فهي زانية
Revenir en haut Aller en bas
marques
Colonel
Colonel


messages: 1909
Inscrit le: 05/11/2007
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 9:59

dinamic a écrit:
trés important . je suis dezoler pour la traduction http://hespress.com/interviews/45030.html

du délire illimunati ..

une honte pour Hespress de publier ce genre de délires , une insulte à l'intelligence des Marocains qui sont traités comme des idiots ...

pour info, cet individu n'a jamais rien trouvé , à part des articles dans internet !!

Revenir en haut Aller en bas
docleo
Lt-colonel
Lt-colonel


messages: 1298
Inscrit le: 03/09/2008
Localisation: de garde
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 10:34

Et quand hespress and co été des sources fiables?

_________________
John F. Kennedy: « Vous qui, comme moi, êtes Américains, ne vous demandez pas ce que votre pays peut faire pour vous, mais demandez-vous ce que vous pouvez faire pour votre pays. Vous qui, comme moi, êtes citoyens du monde, ne vous demandez pas ce que les États-Unis peuvent faire pour le monde, mais demandez-vous ce que vous pouvez faire pour le monde. ».
Revenir en haut Aller en bas
http://medecinsmaroc.xooit.com/index.php
yassine1985
Colonel-Major
Colonel-Major


messages: 2591
Inscrit le: 11/11/2010
Localisation: Marrakech
Nationalité: Maroc
Médailles de mérite:


MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 11:31


Citation :

Circle Oil completes Morocco pipeline



AIM-listed Circle Oil has announced it has completed a pipeline in Morocco to deliver gas it discovered in the past four years in the Rharb Basin to local industry.

The eight-inch Sebou (DRJ)-Kenitra pipeline runs for around 55km with a capacity of 23.5 million standard cubic feet per day.

It has been connected to seven of the ten potential producing wells, with tie-in for the remaining wells scheduled for completion during the current quarter.

These wells were discoveries made during the explorer’s drilling campaigns of 2008-2009 and 2010-2011.

The pipeline is now undergoing pressure testing due to be completed by the end of the month prior to commissioning and the start up of increased gas delivery to local industry, Circle Oil said in a statement on Monday.

Circle Oil is an international exploration, development and production company with assets in Morocco, Tunisia, Oman and Egypt.

Evil or Very Mad
It owns a 75% interest in the pipeline with state partner the National Office for Hydrocarbons and Mining (ONHYM) holding the remaining 25%. It holds a 75% interest in the Sebou and Lalla Mimouna Permit Concessions and a 60% in the Oulad N'zala Permit Concession, with ONHYM holding the respective remainder of each concession.

The Middle East and North Africa-focused junior also announced meanwhile it had appointed Tarek Elbarkatawy as the new general manager for its Egyptian operations.

Elarbkatawy, a 24-year industry veteran, would be responsible for managing the player's 40% interest in the northwestern Gemsa concession and identifying fresh exploration opportunities in Egypt, Circle Oil said.

Bill Lehane 09 January 2012 09:25 GMT

http://www.upstreamonline.com/live/article296838.ece

_________________
."قال الرسول صلى الله عليه وسلم : "أيما امرأة استعطرت فمرّت بقوم ليجدوا ريحها فهي زانية
Revenir en haut Aller en bas
ScorpionDuDesert
Adjudant
Adjudant


messages: 392
Inscrit le: 15/08/2010
Localisation: France
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 11:59

yassine1985 a écrit:

Citation :

Circle Oil completes Morocco pipeline
...

Evil or Very Mad
It owns a 75% interest in the pipeline with state partner the National Office for Hydrocarbons and Mining (ONHYM) holding the remaining 25%. It holds a 75% interest in the Sebou and Lalla Mimouna Permit Concessions and a 60% in the Oulad N'zala Permit Concession, with ONHYM holding the respective remainder of each concession.

...

http://www.upstreamonline.com/live/article296838.ece

Citation :

Sebou Permits

In this context Circle Oil Maroc Ltd. (COML), a wholly owned subsidiary of Circle Oil Plc signed an Exploration and Exploitation Agreement with ONHYM (Office National des Hydrocarbures et des Mines) for the Sebou Concession ( originally before first relinquishment 296 km sq.), situated in the Rharb Basin, Morocco. This Exploration Agreement is for a total period of 8 years with the right of automatic conversion to a minimum (but extendable) 30 year Exploitation period. The Sebou Permit has previously been owned, explored and exploited by ONHYM. In the new partnership the shareholding is COML 75% and ONHYM 25%. In addition COML signed a similar agreement for the small Oulad N’Zala Concession (25 sq.km.) which is contained within the boundaries of the Sebou Concession, which as an existing concession backed into, remains bound by the previous hydrocarbon code. The percentage interests for this concession are ONHYM 40% and COML 60%.

source: http://www.circleoil.net
mgherba mjebdin Laughing
Revenir en haut Aller en bas
dan
Adjudant
Adjudant


messages: 386
Inscrit le: 02/11/2010
Localisation: FRANCE
Nationalité: Maroc

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 12:06

L'important c'est qu'ils découvrent du gaz et du petrole en abondance et qu'ils mettent en place instalationsnecessaire (pipeline , plateforme petrolière) . Après pours les 25/100 et 75/100 on aura qu'a inverser les parts
Revenir en haut Aller en bas
Yakuza
Administrateur
Administrateur


messages: 20101
Inscrit le: 15/09/2009
Localisation: 511
Nationalité: Maroco-Allemand
Médailles de mérite:


MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Lun 9 Jan - 14:38

Citation :
Tangiers Petroleum à la poursuite de l’or noir
Publié le : 9 janvier 2012

Tangiers Petroleum vient de déposer sa demande d’introduction à AIM, un marché de la Bourse de Londres. Elle compte lever 67 millions de dirhams pour accélérer ses travaux d’exploration au niveau du bloc de Tarfaya. Après les études sismiques 3D sur 3 sites prometteurs, la compagnie veut passer vite à l’étape forage.


Le bloc Tarfaya couvre ainsi au total 8 permis sur 15 041 km2 à une cinquantaine de kilomètres des îles Canaries, avec des profondeurs de moins de 200 mètres.

Les appétits des grands mondiaux de l’exploration pétrolière se font de plus en plus sentir pour être les pionniers à faire sortir l’or noir de nos terres. Comme a été révélé récemment par le Soir échos, l’un des groupes les plus actifs au Maroc est l’Australien Tangiers Petroleum. Ce dernier compte mettre les bouchées doubles pour mener à bien ses projets offshore à Tarfaya au sud du royaume. Jeudi dernier, le groupe a déposé sa demande d’admission au marché AIM (Alternative Investment Market), un marché d’échanges publics géré par le London Stock Exchange (LSE). La cotation sera admise probablement le 3 février prochain avec un code « TPET » dans la Bourse de Londres. L’objectif de cette opération est de lever environ 5 millions de livres sterling sur le marché, l’équivalent de 67 millions de dirhams qui seront destinés spécialement aux projets du groupe au Maroc. RFC Corporate Finance est le conseiller principal de cette opération, les sociétés de Bourse Shore Capital Stockbrokers et Old Park Lane Capital ont également été approchés pour suivre à côté de RFC cette introduction.


Le programme sismique 3D a commencé fin décembre

Cette décision est prise juste après l’annonce du groupe australien d’un important contrat le 24 décembre 2011. Il a conclu un accord avec Polarcus Samur pour commencer le programme sismique 3D sur les 677 km ² de son bloc offshore de Tarfaya. L’étude sismique a été conçue de façon à inclure trois des sites les plus significatifs de l’entreprise, à savoir Assaka, Trident, et TMA, qui représentent un potentiel de milliards de barils. «Tangiers est heureuse aujourd’hui de vous annoncer la conclusion d’un accord visant à accélérer l’acquisition d’un programme sismique 3D sur Assaka, Trident et TMA. Cela va accélérer considérablement les efforts d’exploration de Tangiers au Maroc et nous permettre d’avoir une visibilité quant à nos perspectives d’un potentiel de 1 milliard de barils sur ce site plus tôt que prévu», avait déclaré Mark Ceglinski, président de la compagnie pétrolière. Les trois sites ont été évalués par un consultant pétrolier mondial indépendant et a estimé le potentiel à 758 millions de barils de pétrole.

Des prévisions très optimistes qui ont poussé la compagnie australienne a accélérer le processus d’exploration. Il faudra environ 25 jours pour compléter l’acquisition sismique, a déclaré la compagnie. C’est donc le mercredi 18 janvier prochain que le programme sera complété dans le meilleur des cas. Par la suite, lorsque les données seront interprétées, il est prévu d’accélérer le projet du programme de forage d’exploration dans le bloc, a tenu à rappeler la compagnie.

8 prospects représentant un potentiel de 5 milliards de barils

Pour rappel, ce n’est pas les seuls sites que Tangiers Petroleum compte à son actif sur le bloc de Tarfaya. L’Australien a identifié le mois dernier trois nouveaux prospects après le traitement de données sismiques 2D. Le bloc Tarfaya couvre ainsi au total 8 permis sur 15 041 km2, à une cinquantaine de kilomètres des îles Canaries, avec des profondeurs de moins de 200 mètres.Nommés Apollo, Hermes et Hercule, ces nouveaux prospects se situent dans des intervalles du crétacé inférieur, dont des relevés antérieurs ont laissé espérer des réservoirs d’excellente qualité et des porosités au dessus de 25 %, pour la portion haute. Une fois l’interprétation du Crétacé inférieur achevée, Tangiers commencera à déterminer le volume des ressources. Comme ce fut le cas pour les prospects d’Assaka, Trident et TMA. Pour information, les prévisions du potentiel des 8 prospects détenus par Tangiers sont estimés à environ 5 milliards de barils. La compagnie pétrolière détient une participation de 75% dans les huit permis de Tarfaya, tandis que le gouvernement marocain, à travers l’OHNYM (l’Office national des hydrocarbures et des mines), contrôle les 25% restants.◆

Citation :
Tarfaya attire

Dans la même région, à côté de Tangiers, on retrouve un autre géant mondial de l’exploration pétrolière, la compagnie irlandaise San Leon Energy. Entre 2008 et 2009, la société a effectué des études techniques qui se sont avérées concluantes et a pu déduire un potentiel de 62 litres d’huile extraite par tonne produite de schistes bitumeux. Ces mêmes études ont démontré que 50 milliards de barils peuvent être récupérés sur les 6 000 mètres carrés exploités, à environ 200 kilomètres au Nord de Tarfaya. Par rapport au contrat, c’est les mêmes pourcentages qui sont appliqués à la compagnie australienne, puisque San Leon a 75% du projet et les 25% restants sont détenus par l’ONHYM. Le projet a une durée initiale de trois ans, pendant lesquels San Leon aura l’exclusivité sur le terrain.
lesoir-echos

_________________
Revenir en haut Aller en bas
marques
Colonel
Colonel


messages: 1909
Inscrit le: 05/11/2007
Nationalité: Maroc
Médailles de mérite:

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Mer 11 Jan - 11:36

Yakuza a écrit:
la cadeau mesure 1,1B bbl confirmés Very Happy

http://www.puravidaenergy.com.au/news_pdf/1111_PV_SHU_v01.pdf

Hier, Pura Vida Energy vient de clore son IPO (augmentation de capital) de 4 M$ qui a été sursouscrite par des investisseurs australiens ..signe qui ne trompe pas car les australien s'y connaissent très bien en risque pétrolier ..

cette augmentation de capital etait necessaire pour ramener d'autres investisseurs prêts à financer le programme d'exploration et surtout de forage-test sur la zone off-shore Mazagan ..



Revenir en haut Aller en bas
MAATAWI
Modérateur
Modérateur


messages: 13775
Inscrit le: 07/09/2009
Localisation: Maroc
Nationalité: Maroc
Médailles de mérite:



MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Mer 11 Jan - 13:24

Bonne nouvelle Smile



(3la llah)

_________________
Le Prophéte (saw) a dit: Les Hommes Les meilleurs sont ceux qui sont les plus utiles aux autres
Revenir en haut Aller en bas
dan
Adjudant
Adjudant


messages: 386
Inscrit le: 02/11/2010
Localisation: FRANCE
Nationalité: Maroc

MessageSujet: Re: Maroc exploitation du Gaz/pétrole lourd   Ven 13 Jan - 21:51

Citation :
Connectivity observed at Morocco oil shale pilot
Social Media Tools


HOUSTON, Jan. 13

By OGJ editors

San Leon Energy PLC said it has established connectivity between the two test wells in its Tarfaya oil shale project in coastal southern Morocco.

The company will identify an alternate drill site away from existing wells to test the extent of the play and the associated aquifers and is contemplating a hydrodynamic study of the basin. San Leon has opened a data room with geotechnical information and pilot plant engineering designs and is discussing participation with several interested parties.

Injection water is observed in three wells, including San Leon’s pilot Wells A and B and the preexisting Star 12 core hole (OGJ Online, June 23, 2011). The wells are hydraulically connected through a permeable zone at 191 m to 197.62 m below ground level. The Star 12 well provided, over a long period, a flow path from the upper aquifer, feeding the permeable zone below 184.8 m.

After cementation of the Star 12 well, the permeable zone acted as a closed system with depletion related to formation water production via air lift. Samples suggest that the water from the permeable zone is similar to the shallow aquifer and contains primarily sodium chloride (78-91% of dissolved solids by weight) with small amounts of magnesium, calcium, potassium, sulfate, and nitrate.

Despite establishing hydraulic connection between the two pilot wells, the company has decided not to risk contaminating the shallow water aquifer. Further analysis will be performed prior to resuming operations either at the same location or at an alternative site.

The company said it will continue to prove up the in situ extraction concept of the Tarfaya oil shale resources and rapidly progress toward operation of the processing pilot plant designed and built for the project
Revenir en haut Aller en bas
 

Maroc exploitation du Gaz/pétrole lourd

Voir le sujet précédent Voir le sujet suivant Revenir en haut 
Page 39 sur 67Aller à la page : Précédent  1 ... 21 ... 38, 39, 40 ... 53 ... 67  Suivant

Permission de ce forum:Vous ne pouvez pas répondre aux sujets dans ce forum
Royal Moroccan Armed Forces ::  :: -